Lift Chargers Severn MD

  • Severn, MD

    Location

  • Hatzel & Buehler, Inc.

    Client

  • N/A

    Cost - Entire Project

  • 2024

    Completion Date

  • N/A

    Project Owner

MDS Engineering provided full electrical design and permitting support for new lift battery charging systems at a high-volume warehouse in York County, PA. The scope included new 480V circuit layouts, feeder sizing, load calculations, and integration with existing panelboards, all designed to meet NEC 2020 standards. MDS delivered sealed permit-ready drawings and coordinated directly with the AHJ to ensure safe, scalable, and code-compliant power infrastructure for the facility’s expanding fleet.