Northeastern Sewer Authority Generator
-
York, PA
Location
-
N/A
Client
-
N/A
Cost - Entire Project
-
2024
Completion Date
-
N/A
Project Owner
MDS Engineering provided full-service electrical design for a generator system replacement at NEYCSA’s Canal Road and Willow Springs Lane Pumping Station. The project included a new 77kW Kohler generator, 200A ATS, updated distribution equipment, and all associated conduit, grounding, and mounting infrastructure to meet NEC and local code requirements. The result is a durable, code-compliant backup power solution that enhances operational reliability for critical wastewater infrastructure.